老挝赛德3水电站勘察设计Laos Xeset 3 Hydropower Station Investigation And Design

 

   

赛德3水电站位于老挝南部沙拉弯省赛德河上,电站采用引水式开发,最大坝高14m,引水明渠1353m,涵管1277m,压力管道1030m,利用水头148m,总库容46.4m3,装机容量23MW。我公司承担工程招标及施工详图阶段的勘察设计工作,工程于201311月开工,20167月投产发电。

 

Xeset 3 Hydropower Station is located on the Xeset River of Savannakhet Province in the south of Laos. This scheme has a head-works with a dam of 14 m maximum height and a reservoir capacity of about 464,000 m3, a water conveyance system including the 1,353 m long channel, the 1,277 m long culvert pipe and the 1,030 m long penstock, and a surface powerhouse. It has a gross head of 148 m and a total installed capacity of 23 MW. Our company is responsible for the investigation and design of this project in bidding and construction phases, and the project was commenced in November 2013, it will be completed and putted into service in July 2016.